Feature:
1.Platform is cutted by large-scale numerical control panel once shaping and smooth cutting.
2.Platform be made of high-quality manganese steel plate by carbon dioxide gas shielded arc welding from welding, high strength, rigidity, and many technology-holes can be easily arranged anchor device.
3.The hydraulic sidewise lift platform and loading ramp facilitates any accident-handling vehicle up and down conveniently.
4.Reasonable platform height makes operation conveniently. Humanized Design for the main clamp can realize the adjustment of main clamp upper and lower, before and after between the least bit.
5.The wealth of tools to prepare, for the arbitrary choice of the operator.
6.At the same time, two-pulling towers composite pulling, and more reflect the superiority of partial pull-out operation.
Specifications:
| Tower Max. Tension--------------95KN |
Platform Width-------------------2100mm | Hydraulic Pressure-------------70MPa |
Platform Height--------------------500mm | Pneumatic Pressure-----------0.8MPa |
Max. Lifting Weight-------------3000kgs | Tower Working Rang------360degree |
Total Weight----------------------2000kgs | Total Cubic Measure----------6.5CBM |